a LOT more
There is another 15ft of shelving units going in between the "work" area and where we are putting in a pantry and bathroom. Then on the other side of the steps (steps come down on the wall where the workbench is) - there will be another 2 units in a big L - that is.....20 ft for one, and 15 for another (ish). Then the entire side wall will be shelving for the family shit. LOL
This was phase 1 of.......4. Bathroom and pantry are next. Then the 15ft between them, then the other 2 shelving areas are last phase.
|